{"id":31109,"date":"2026-09-18T07:04:48","date_gmt":"2026-09-18T07:04:48","guid":{"rendered":"https:\/\/doingcable.com\/?p=31109"},"modified":"2026-09-18T07:04:50","modified_gmt":"2026-09-18T07:04:50","slug":"how-much-does-an-aluminum-extrusion-machine-cost","status":"publish","type":"post","link":"https:\/\/doingcable.com\/ar\/how-much-does-an-aluminum-extrusion-machine-cost\/","title":{"rendered":"How much does an Aluminum Extrusion Machine cost?"},"content":{"rendered":"<h1 class=\"wp-block-heading\">Aluminum Extrusion for Profiles and Cable Sheath<\/h1>\n\n\n\n<p>\u0625\u0646 <strong><a href=\"https:\/\/doingcable.com\/ar\/product\/aluminum-material-continuous-extrusion-machine\/\">aluminum extrusion machine<\/a><\/strong> is either a <strong>hydraulic press<\/strong> that pushes a heated billet through a die, or a <strong>Conform \/ continuous rotary extruder<\/strong> that converts \u00d89.5\u201315 mm aluminum rod into seamless tube or sheath. Press cost tracks <strong>tonnage and origin<\/strong>. Cable-sheath cost tracks <strong>wheel diameter, tube OD and whether corrugating + \u00d84500 take-up are in the line<\/strong>. Mixing the two in one RFQ produces a number that cannot be commissioned.<\/p>\n\n\n\n<p><strong>2025\u20132026 equipment bands (FOB, order-of-magnitude)<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Equipment<\/th><th>Typical specification<\/th><th>Indicative new price<\/th><\/tr><\/thead><tbody><tr><td>Hydraulic press only, CN 600\u2013800 T<\/td><td>\u00d880\u2013110 mm billet<\/td><td>USD 85,000\u2013160,000<\/td><\/tr><tr><td>Hydraulic press only, CN 1,000\u20131,250 T<\/td><td>\u00d8120\u2013135 mm billet<\/td><td>USD 150,000\u2013300,000<\/td><\/tr><tr><td>Hydraulic press only, CN 1,800\u20132,500 T<\/td><td>\u00d8178\u2013228 mm billet<\/td><td>USD 300,000\u2013550,000<\/td><\/tr><tr><td>Hydraulic press only, CN \/ EU 3,000\u20135,500 T<\/td><td>large structural<\/td><td>USD 0.5\u20132.0 M+ (EU higher)<\/td><\/tr><tr><td>Full small profile plant 600\u20131,250 T<\/td><td>press + furnace + puller + saw + aging<\/td><td>USD 0.5\u20131.5 M installed<\/td><\/tr><tr><td>Medium profile plant 1,600\u20133,500 T<\/td><td>as above, larger civil<\/td><td>USD 1.5\u20135 M installed<\/td><\/tr><tr><td>Conform cable Al sheath LBF350\u2013420 class<\/td><td>tube \u00d860\u2013170 mm<\/td><td>quote by wheel + corrugator<\/td><\/tr><tr><td>Conform HV sheath SSLB \/ LBF540 class<\/td><td>tube to \u00d8180 mm, 4-rod feed<\/td><td>often USD 0.18\u20131.8 M by scope<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Global press market average in 2025 sat near <strong>USD 2.4 million per unit<\/strong> across all tonnages \u2014 that average is pulled up by 5,000 T+ European frames and is not the price of a 1,000 T Chinese press.<\/p>\n\n\n\n<p>Send alloy, profile circumscribed circle <strong>\u0623\u0648<\/strong> sheath OD\/wall, annual tonnes, and whether the quote is press-only or turnkey. <strong>\u0627\u0633\u062a\u0641\u0633\u0631 \u0627\u0644\u0622\u0646<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-full is-resized\"><img fetchpriority=\"high\" decoding=\"async\" width=\"749\" height=\"562\" src=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/09\/1000t-Aluminium-Extrusion-Press-Line-Extruder-Machine-doingcable.webp\" alt=\"\" class=\"wp-image-31110\" style=\"width:852px;height:auto\" srcset=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/09\/1000t-Aluminium-Extrusion-Press-Line-Extruder-Machine-doingcable.webp 749w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/09\/1000t-Aluminium-Extrusion-Press-Line-Extruder-Machine-doingcable-400x300.webp 400w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/09\/1000t-Aluminium-Extrusion-Press-Line-Extruder-Machine-doingcable-16x12.webp 16w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/09\/1000t-Aluminium-Extrusion-Press-Line-Extruder-Machine-doingcable-430x323.webp 430w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/09\/1000t-Aluminium-Extrusion-Press-Line-Extruder-Machine-doingcable-700x525.webp 700w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/09\/1000t-Aluminium-Extrusion-Press-Line-Extruder-Machine-doingcable-250x188.webp 250w\" sizes=\"(max-width: 749px) 100vw, 749px\" \/><\/figure>\n\n\n\n<h1 class=\"wp-block-heading\">How Much Does an Aluminum Extrusion Machine Cost?<\/h1>\n\n\n\n<p>A new aluminum extrusion machine in 2025\u20132026 costs from about <strong>USD 85,000<\/strong> for a Chinese 600 T press body to <strong>USD 1\u201325 million<\/strong> for a high-tonnage automated European line; a cable aluminum-sheath continuous extruder is a different machine and is priced by wheel size and tube range, commonly from the mid-six figures to about <strong>USD 1.6\u20131.8 million<\/strong> for a full HV sheathing line.<\/p>\n\n\n\n<p>The published \u201caverage press\u201d of ~USD 2.4 million in 2025 describes the global mix of ~300 units\/year, not the machine a window-profile plant or a 132 kV cable plant should put on a purchase order. Tonnage, origin, auxiliaries and Conform versus billet-press architecture move the number by a factor of ten.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Why do two plants asking for an \u201caluminum extrusion machine\u201d get quotes that differ by 10\u00d7?<\/h2>\n\n\n\n<p>They are buying different architectures. A hydraulic press extrudes finite billets into profiles. A Conform continuous extruder plasticizes aluminum rod on a rotating wheel and forms endless tube or sheath \u2014 the machine used for corrugated aluminum cable sheath to IEC 60840 \/ IEC 62067.<\/p>\n\n\n\n<p>Hydraulic presses are specified in <strong>tonne-force<\/strong> \u0648 <strong>billet diameter<\/strong>. 600 T takes ~\u00d880\u201390 \u00d7 500 mm; 1,250 T ~\u00d8130\u2013135 \u00d7 800 mm; 2,500 T ~\u00d8228 \u00d7 1,100 mm; 4,000 T ~\u00d8320 mm class. Extrusion speed on these frames is on the order of <strong>10\u201315 mm\/s<\/strong> ram speed, not line metres per minute of cable. Chinese 600\u20131,250 T press bodies list in the <strong>USD 85,000\u2013300,000<\/strong> band; 1,800\u20132,500 T in the <strong>USD 300,000\u2013550,000<\/strong> band on current factory cards. German\/Italian equivalents of the same force run <strong>30\u201350% higher<\/strong>. A 1,250 T Chinese press at USD 180,000\u2013300,000 versus USD 400,000\u2013600,000 for a comparable EU machine is the split procurement sees repeatedly.<\/p>\n\n\n\n<p>Conform cable lines are specified by <strong>wheel \u00d8 (350 \/ 400 \/ 420 \/ 540 mm)<\/strong>, <strong>rod count and diameter (2\u00d7\u00d812 or 4\u00d7\u00d89.5 \/ \u00d812 \/ \u00d815 mm, GB\/T 3954)<\/strong>, \u060c \u0648 <strong>tube OD \u00d7 wall<\/strong> (typically \u00d860\u2013180 mm \u00d7 1.5\u20135.0 mm). Corrugation pitch 10\u201350 mm and depth 2\u20138 mm sit after the tube die. One published HV sheathing line (SSLB500 class) lists <strong>USD 1.65\u20131.80 million<\/strong> FOB. Smaller cladding\/sheath Conform units and used Conform busbar machines sit well below that. Do not compare that number to a 1,000 T window-profile press.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Item<\/th><th>Hydraulic profile press<\/th><th>Conform cable Al sheath line<\/th><\/tr><\/thead><tbody><tr><td>Feedstock<\/td><td>Heated billet 6063 \/ 6061 etc.<\/td><td>EC \/ electrical rod \u00d89.5\u201315 mm<\/td><\/tr><tr><td>Product<\/td><td>Finite bars, tubes, profiles<\/td><td>Endless seamless Al tube \/ sheath<\/td><\/tr><tr><td>Key size<\/td><td>Tonnage + container \u00d8<\/td><td>Wheel \u00d8 + tube OD \u00d7 wall<\/td><\/tr><tr><td>Typical new CN price<\/td><td>600 T ~USD 87\u201394k; 1,250 T ~USD 160\u2013300k; 2,500 T ~USD 0.5 M<\/td><td>LBF \/ LB \/ SSLB: mid-six figures to ~USD 1.8 M full HV line<\/td><\/tr><tr><td>Auxiliaries that dominate cost<\/td><td>Billet furnace, die oven, puller, stretcher, aging oven<\/td><td>Rod clean, corrugator, \u00d84500 pay-off\/take-up, cooling<\/td><\/tr><tr><td>Cable relevance<\/td><td>Busbar, tray, enclosure<\/td><td>MV\/HV\/EHV corrugated Al sheath, IEC 60840 \/ 62067<\/td><\/tr><tr><td>Weld in product<\/td><td>Die seams on hollows; billet joints<\/td><td>No longitudinal weld if Conform is correct<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>A cable factory that buys a 1,800 T profile press \u201cto make aluminum sheath\u201d still needs a welder, a corrugator and a 4.5 m drum \u2014 and still has a weld. That is the wrong machine.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What does the press or Conform line actually include in a usable price?<\/h2>\n\n\n\n<p>The press body is 40\u201365% of a small plant and much less of a turnkey HV sheath line. Furnace, puller, aging, dies \u2014 or rod-clean, corrugator and 4.5 m drums \u2014 are what turn a brochure price into a running plant.<\/p>\n\n\n\n<p><strong>Hydraulic line stack (small \/ medium plant)<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Block<\/th><th>Small plant 600\u20131,250 T<\/th><th>Medium 1,600\u20133,500 T<\/th><\/tr><\/thead><tbody><tr><td>Press<\/td><td>USD 150,000\u2013550,000<\/td><td>USD 500,000\u20131,800,000<\/td><\/tr><tr><td>Billet furnace<\/td><td>30,000\u2013120,000<\/td><td>higher with log length<\/td><\/tr><tr><td>Die oven<\/td><td>10,000\u201340,000<\/td><td><\/td><\/tr><tr><td>Cooling bed + puller<\/td><td>25,000\u201380,000<\/td><td><\/td><\/tr><tr><td>Stretcher + saw<\/td><td>30,000\u2013100,000<\/td><td><\/td><\/tr><tr><td>Aging oven (T5\/T6)<\/td><td>20,000\u201380,000<\/td><td><\/td><\/tr><tr><td>First die set<\/td><td>30,000\u201380,000<\/td><td>80,000\u2013200,000<\/td><\/tr><tr><td>Land \/ building \/ 3-month WC<\/td><td>often USD 160,000\u2013500,000+<\/td><td>450,000\u20131.4 M<\/td><\/tr><tr><td><strong>Plant total often cited<\/strong><\/td><td><strong>USD 0.5\u20131.5 M<\/strong><\/td><td><strong>USD 1.5\u20135 M<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>Energy is 15\u201325% of later opex; metal is 50\u201360%. Payback on a utilized press is commonly quoted <strong>3\u20137 years<\/strong>; that assumes the press is not waiting on dies or aging capacity.<\/p>\n\n\n\n<p><strong>Conform cable sheath stack<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Wheel + tooling (350\/420\/540 class)<\/li>\n\n\n\n<li>2- or 4-rod pay-off and surface clean<\/li>\n\n\n\n<li>Tube die + optional corrugator (pitch 10\u201350 mm, depth 2\u20138 mm)<\/li>\n\n\n\n<li>Cooling, spark \/ diameter gauges<\/li>\n\n\n\n<li>Portal pay-off and take-up <strong>PN4500<\/strong> on HV lines<\/li>\n\n\n\n<li>Main motor on the order of <strong>315\u2013600 kW<\/strong> on mid-to-large sheath machines<\/li>\n<\/ul>\n\n\n\n<p>LBF420\u00d72: rod \u00d89.5 mm, wheel 420 mm, tube \u00d860\u2013170 \u00d7 1.5\u20135.0 mm. LBF540\u00d72: rod \u00d812 mm, wheel 540 mm, tube to \u00d8180 mm. Those two frames cover most 66\u2013220 kV corrugated aluminum sheath constructions.<\/p>\n\n\n\n<p>Used hydraulic presses and used Conform units cut capex <strong>30\u201360%<\/strong>. Lead time on new large presses is <strong>12\u201318 months<\/strong> in 2026 demand cycles; used is the only way some plants start inside a year. Inspect container, stem, wheel groove and gearbox hours \u2014 not paint.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">How should a buyer choose tonnage or wheel size instead of chasing the lowest FOB number?<\/h2>\n\n\n\n<p>Choose press tonnage from the <strong>circumscribed circle and wall<\/strong> of the heaviest profile, and Conform wheel size from the <strong>largest sheath OD and wall<\/strong> on the cable construction sheet. Under-tonnage and under-wheel are the two capital mistakes that show up as cracked dies and thin spots, not as a cheap PO.<\/p>\n\n\n\n<p><strong>Profile press.<\/strong> 600\u2013800 T: small 6063 architectural. 1,100\u20131,250 T: general industrial, \u00d85 inch class billet. 1,800\u20132,500 T: \u00d87\u20139 inch, larger hollows. 3,000 T+: structural and thick wall. Specific pressure in the container, not the nameplate tonne figure, is what fills a thin-wall hollow. Short-stroke front-load presses cost more than long-stroke equivalents of the same force and cut dead-cycle time.<\/p>\n\n\n\n<p><strong>Cable Conform.<\/strong> Tube \u00d860\u2013120 mm \/ wall 1.5\u20133 mm \u2192 LBF350 class. Tube to \u00d8170 mm \/ wall to 4\u20135 mm \u2192 LBF420. Tube to \u00d8180 mm and heavier HV\/EHV \u2192 LBF540 \/ SSLB500 class. IEC 60840 (30\u2013150 kV) and IEC 62067 (&gt;150 kV) require a radial moisture barrier; seamless Conform sheath removes the longitudinal weld that argon-arc welded tape still carries. Wall minimums on published Conform cards are about <strong>1.5 mm below ~\u00d880 mm tube and 1.8 mm above<\/strong>.<\/p>\n\n\n\n<p>Do not buy 2,500 T \u201cfor future 220 kV sheath.\u201d The press cannot form a 4.5 m drum of corrugated tube around an XLPE core.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Which standards and FAT items belong on the purchase contract?<\/h2>\n\n\n\n<p>Profile presses are accepted on force, billet size, ram speed and first-article profile tolerance (EN 755 \/ GB\/T 5237 family). Cable Conform lines are accepted on tube OD, wall, corrugation geometry and a moisture-barrier construction that can sit under IEC 60840 \/ IEC 62067 sheath clauses.<\/p>\n\n\n\n<p><strong>Metal and product<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Billet alloys 6063 \/ 6061 \/ 6082 and temper after aging (T5\/T6).<\/li>\n\n\n\n<li>Electrical rod GB\/T 3954 (A2\/A4\/A8) or equivalent EC rod for Conform.<\/li>\n\n\n\n<li>IEC 60840:2020 and IEC 62067 for HV\/EHV cable with metallic sheath.<\/li>\n\n\n\n<li>EN 755 series dimensional tolerances on profiles.<\/li>\n<\/ul>\n\n\n\n<p><strong>FAT that prevents a cheap press from failing in month three<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Nameplate force verified on a load cell or calculated from main-cylinder area \u00d7 21 MPa (typical CN card pressure).<\/li>\n\n\n\n<li>First die: wall thickness and gap on the heaviest hollow in the PO.<\/li>\n\n\n\n<li>Conform: continuous 200 m tube at specified OD \u00d7 wall; no groove-mark crack; corrugation pitch\/depth within drawing.<\/li>\n\n\n\n<li>Motor kW and oil temperature at rated cycle.<\/li>\n\n\n\n<li>Used machines: container liner ID, stem wear, wheel-groove depth, gearbox vibration.<\/li>\n<\/ul>\n\n\n\n<p>A 1,000 T press listed at USD 35,000\u2013130,000 on a trading portal is not the same object as a 1,000 T short-stroke line with furnace and puller. Read the scope line by line.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What fails after a low-price extrusion machine is installed?<\/h2>\n\n\n\n<p>Under-force, missing aging, welded sheath sold as seamless, and used containers that have lost liner interference are the four defects that convert a cheap PO into scrap metal.<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Profile will not fill.<\/strong> Tonnage sized on solid bar, then used on a thin-wall hollow. Recalculate specific pressure or step up a frame.<\/li>\n\n\n\n<li><strong>T6 properties fail.<\/strong> Press bought, aging oven omitted. 6061-T6 is a furnace problem, not a ram problem.<\/li>\n\n\n\n<li><strong>HV cable fails a moisture test.<\/strong> Welded aluminum tape specified as \u201cextruded sheath.\u201d Conform or a qualified weld + corrugation procedure \u2014 not a 1,250 T window press.<\/li>\n\n\n\n<li><strong>Tube wall \u00b10.3 mm.<\/strong> Wheel groove worn or rod oxide not cleaned. Conform FAT must include rod-clean current and groove inspection.<\/li>\n\n\n\n<li><strong>Used 2,500 T arrives with cracked platen.<\/strong> Price was 40% of new; remaining life was not. Borescope the container before the LC is released.<\/li>\n\n\n\n<li><strong>Energy bill eats the capex gap.<\/strong> Old hydraulics versus new short-stroke \/ variable pumps. Energy is 15\u201325% of opex; model kWh\/kg before celebrating a used bargain.<\/li>\n<\/ol>\n\n\n\n<p>2024\u20132026: Chinese 600\u20131,250 T remains the volume entry; 1,800\u20132,500 T is the industrial workhorse; Conform LBF420\/540 is the cable-sheath specification that belongs next to IEC 60840 on an HV RFQ; used equipment demand is up because new large-press lead times run 12\u201318 months.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"800\" height=\"600\" src=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/09\/Continuous-Extrusion-Line-for-Aluminum-process-line-doingcable.webp\" alt=\"\" class=\"wp-image-31111\" srcset=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/09\/Continuous-Extrusion-Line-for-Aluminum-process-line-doingcable.webp 800w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/09\/Continuous-Extrusion-Line-for-Aluminum-process-line-doingcable-400x300.webp 400w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/09\/Continuous-Extrusion-Line-for-Aluminum-process-line-doingcable-768x576.webp 768w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/09\/Continuous-Extrusion-Line-for-Aluminum-process-line-doingcable-16x12.webp 16w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/09\/Continuous-Extrusion-Line-for-Aluminum-process-line-doingcable-430x323.webp 430w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/09\/Continuous-Extrusion-Line-for-Aluminum-process-line-doingcable-700x525.webp 700w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/09\/Continuous-Extrusion-Line-for-Aluminum-process-line-doingcable-250x188.webp 250w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>Aluminum Extrusion for Profiles and Cable Sheath An aluminum extrusion machine is either a hydraulic press that pushes a heated<\/p>","protected":false},"author":1,"featured_media":31112,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_joinchat":[],"footnotes":""},"categories":[565],"tags":[],"class_list":["post-31109","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized-en"],"_links":{"self":[{"href":"https:\/\/doingcable.com\/ar\/wp-json\/wp\/v2\/posts\/31109","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/doingcable.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/doingcable.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/doingcable.com\/ar\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/doingcable.com\/ar\/wp-json\/wp\/v2\/comments?post=31109"}],"version-history":[{"count":1,"href":"https:\/\/doingcable.com\/ar\/wp-json\/wp\/v2\/posts\/31109\/revisions"}],"predecessor-version":[{"id":31113,"href":"https:\/\/doingcable.com\/ar\/wp-json\/wp\/v2\/posts\/31109\/revisions\/31113"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/doingcable.com\/ar\/wp-json\/wp\/v2\/media\/31112"}],"wp:attachment":[{"href":"https:\/\/doingcable.com\/ar\/wp-json\/wp\/v2\/media?parent=31109"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/doingcable.com\/ar\/wp-json\/wp\/v2\/categories?post=31109"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/doingcable.com\/ar\/wp-json\/wp\/v2\/tags?post=31109"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}