{"id":29998,"date":"2026-05-14T11:44:01","date_gmt":"2026-05-14T11:44:01","guid":{"rendered":"https:\/\/doingcable.com\/?post_type=product&#038;p=29998"},"modified":"2026-05-16T18:53:41","modified_gmt":"2026-05-16T18:53:41","slug":"mv-hv-ccv-line-for-high-voltage-cables","status":"publish","type":"product","link":"https:\/\/doingcable.com\/ar\/product\/mv-hv-ccv-line-for-high-voltage-cables\/","title":{"rendered":"\u062e\u0637 \u0625\u0646\u062a\u0627\u062c \u0643\u0627\u0628\u0644\u0627\u062a \u0627\u0644\u062c\u0647\u062f \u0627\u0644\u0639\u0627\u0644\u064a (\u0645\u062a\u0648\u0633\u0637\/\u0639\u0627\u0644\u064a) | \u0625\u0646\u062a\u0627\u062c \u0643\u0627\u0628\u0644\u0627\u062a \u062c\u0647\u062f \u0639\u0627\u0644\u064a \u0645\u0645\u062a\u0627\u0632\u0629 110 \u0643\u064a\u0644\u0648 \u0641\u0648\u0644\u062a"},"content":{"rendered":"<p dir=\"auto\">As a seasoned B2B supplier with over 20 years of specialized expertise in high-voltage cable manufacturing equipment, we understand that your success depends on production lines that deliver consistent dielectric performance, minimal scrap, high throughput, and maximum flexibility. Our Baicheng 110kV Catenary Continuous Vulcanization (CCV) Line represents the pinnacle of triple extrusion technology for XLPE-insulated power cables rated up to 110kV.<\/p>\n<p dir=\"auto\"><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone wp-image-30000\" src=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/13eb3e9c72961946aa7b5c3d05bcac4.png\" alt=\"MV \/ HV CCV Line for High Voltage Cables \" width=\"951\" height=\"477\" srcset=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/13eb3e9c72961946aa7b5c3d05bcac4.png 1089w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/13eb3e9c72961946aa7b5c3d05bcac4-400x201.png 400w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/13eb3e9c72961946aa7b5c3d05bcac4-768x385.png 768w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/13eb3e9c72961946aa7b5c3d05bcac4-18x9.png 18w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/13eb3e9c72961946aa7b5c3d05bcac4-430x216.png 430w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/13eb3e9c72961946aa7b5c3d05bcac4-700x351.png 700w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/13eb3e9c72961946aa7b5c3d05bcac4-150x75.png 150w\" sizes=\"(max-width: 951px) 100vw, 951px\" \/><\/p>\n<p dir=\"auto\">This advanced half-catenary CCV system performs simultaneous one-pass extrusion of the inner semiconductor (conductor screen), XLPE insulation, and outer semiconductor (insulation screen) layers through a precision triple crosshead. The result: homogeneous insulation free of micro-voids, exceptional layer bonding, superior concentricity, and outstanding electrical properties that meet the most stringent international standards for underground, submarine, and overhead transmission applications.<\/p>\n<p dir=\"auto\"><img decoding=\"async\" class=\"alignnone wp-image-30002\" src=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/73f1221d639db5be5246b838d830e98.png\" alt=\"Triple Crosshead For High-Voltage Triple Extrusion CCV Production Line\" width=\"847\" height=\"489\" srcset=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/73f1221d639db5be5246b838d830e98.png 800w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/73f1221d639db5be5246b838d830e98-400x231.png 400w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/73f1221d639db5be5246b838d830e98-768x444.png 768w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/73f1221d639db5be5246b838d830e98-18x10.png 18w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/73f1221d639db5be5246b838d830e98-430x248.png 430w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/73f1221d639db5be5246b838d830e98-700x404.png 700w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/73f1221d639db5be5246b838d830e98-150x87.png 150w\" sizes=\"(max-width: 847px) 100vw, 847px\" \/><\/p>\n<h3 dir=\"auto\">Core Competitive Advantages<\/h3>\n<p dir=\"auto\">Our 110kV triple extrusion CCV line goes far beyond standard configurations to deliver measurable ROI through:<\/p>\n<ul dir=\"auto\">\n<li><strong>True One-Step Triple Extrusion Process<\/strong> \u2014 Eliminates multi-pass interface contamination, ensures perfect layer adhesion, and produces cables with minimal eccentricity and excellent long-term reliability up to 110kV.<\/li>\n<li><strong>Optimized Half-Catenary CCV Design<\/strong> \u2014 Heating section \u224854 m (9 tubes), pre-cooling \u224812 m (2 tubes), cooling \u224884 m (14 tubes) for stable thermal profiling and high-quality crosslinking.<\/li>\n<li><strong>High-Output Capability<\/strong> \u2014 Line speeds up to 30 m\/min (with optional high-output packages reaching higher velocities), supporting conductor sizes Cu 25\u20131000 mm\u00b2 \/ Al 35\u20131000 mm\u00b2 and insulation thickness 3.4\u201315.0 mm.<\/li>\n<\/ul>\n<p><img decoding=\"async\" class=\"alignnone wp-image-30003\" src=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/d62cb7498f4db1cddaab97dd31a0124.png\" alt=\"Extrusion crossheads for cable production\" width=\"894\" height=\"596\" srcset=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/d62cb7498f4db1cddaab97dd31a0124.png 2250w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/d62cb7498f4db1cddaab97dd31a0124-400x267.png 400w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/d62cb7498f4db1cddaab97dd31a0124-1200x800.png 1200w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/d62cb7498f4db1cddaab97dd31a0124-768x512.png 768w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/d62cb7498f4db1cddaab97dd31a0124-1536x1024.png 1536w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/d62cb7498f4db1cddaab97dd31a0124-2048x1365.png 2048w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/d62cb7498f4db1cddaab97dd31a0124-18x12.png 18w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/d62cb7498f4db1cddaab97dd31a0124-430x287.png 430w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/d62cb7498f4db1cddaab97dd31a0124-700x467.png 700w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/d62cb7498f4db1cddaab97dd31a0124-150x100.png 150w\" sizes=\"(max-width: 894px) 100vw, 894px\" \/><\/p>\n<ul>\n<li><strong>Advanced Dual-Rotation &amp; Surface Stabilization Technology<\/strong> \u2014 Integrated dual rotating caterpillars (pre- and post-CV tube) effectively counteract the \u201cpear-drop\u201d effect in the viscous insulation zone. Combined with controlled-temperature gas circulation at the crosshead exit, this delivers superior roundness, reduced torsional stress on Milliken or taped conductors, and significantly lower scrap rates.<\/li>\n<li><strong>Siemens TIA Portal Control System<\/strong> \u2014 High-resolution HMI touch-screen interface with robust anti-interference design, real-time cable position monitoring, automatic capstan speed adjustment, and precise CV tube temperature control for stable, repeatable production.<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-30004\" src=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/82ca756b7b911dc9e43d67c0c839519.png\" alt=\"Siemens SIMATIC HMI Panels\" width=\"906\" height=\"510\" srcset=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/82ca756b7b911dc9e43d67c0c839519.png 2250w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/82ca756b7b911dc9e43d67c0c839519-400x225.png 400w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/82ca756b7b911dc9e43d67c0c839519-1300x731.png 1300w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/82ca756b7b911dc9e43d67c0c839519-768x432.png 768w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/82ca756b7b911dc9e43d67c0c839519-1536x864.png 1536w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/82ca756b7b911dc9e43d67c0c839519-2048x1152.png 2048w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/82ca756b7b911dc9e43d67c0c839519-18x10.png 18w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/82ca756b7b911dc9e43d67c0c839519-430x242.png 430w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/82ca756b7b911dc9e43d67c0c839519-700x394.png 700w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/82ca756b7b911dc9e43d67c0c839519-150x84.png 150w\" sizes=\"(max-width: 906px) 100vw, 906px\" \/><\/p>\n<ul>\n<li><strong>Clean-Run &amp; Long-Run Performance<\/strong> \u2014 Nitrogen-protected environment and optimized material handling minimize contamination and enable longer continuous production runs, reducing joints and material waste.<\/li>\n<li><strong>Full Customization &amp; Upgrade Readiness<\/strong> \u2014 Customer-specific modifications including speed adjustment via CV tube temperature control, extruder configurations, quick conductor splicing packages, and future-proof upgrades for even higher voltages or outputs.<\/li>\n<\/ul>\n<h3 dir=\"auto\">Comprehensive Technical Specifications<\/h3>\n<table style=\"height: 461px;\" width=\"773\">\n<thead>\n<tr>\n<th data-col-size=\"lg\">\u0627\u0644\u0645\u0639\u0644\u0645\u0629<\/th>\n<th data-col-size=\"md\">\u0645\u0648\u0627\u0635\u0641\u0629<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td data-col-size=\"lg\">Voltage Class<\/td>\n<td data-col-size=\"md\">10\u2013110 kV (XLPE)<\/td>\n<\/tr>\n<tr>\n<td data-col-size=\"lg\">Conductor Cross Section<\/td>\n<td data-col-size=\"md\">Cu: 25\u20131000 mm\u00b2 \/ Al: 35\u20131000 mm\u00b2<\/td>\n<\/tr>\n<tr>\n<td data-col-size=\"lg\">Max. Cable Diameter<\/td>\n<td data-col-size=\"md\">80 mm<\/td>\n<\/tr>\n<tr>\n<td data-col-size=\"lg\">Max. Cable Weight<\/td>\n<td data-col-size=\"md\">14.5 kg\/m<\/td>\n<\/tr>\n<tr>\n<td data-col-size=\"lg\">Conductor Screen Thickness<\/td>\n<td data-col-size=\"md\">0.5\u20132.0 mm<\/td>\n<\/tr>\n<tr>\n<td data-col-size=\"lg\">XLPE Insulation Thickness<\/td>\n<td data-col-size=\"md\">3.4\u201315.0 mm<\/td>\n<\/tr>\n<tr>\n<td data-col-size=\"lg\">Insulation Screen Thickness<\/td>\n<td data-col-size=\"md\">0.5\u20132.0 mm<\/td>\n<\/tr>\n<tr>\n<td data-col-size=\"lg\">Line Speed<\/td>\n<td data-col-size=\"md\">0\u201330 m\/min (higher with optional packages)<\/td>\n<\/tr>\n<tr>\n<td data-col-size=\"lg\">Line Configuration<\/td>\n<td data-col-size=\"md\">Half-catenary<\/td>\n<\/tr>\n<tr>\n<td data-col-size=\"lg\">Cross-linking Section<\/td>\n<td data-col-size=\"md\">\u224854 m \/ 9 sections<\/td>\n<\/tr>\n<tr>\n<td data-col-size=\"lg\">Pre-cooling Section<\/td>\n<td data-col-size=\"md\">12 m \/ 2 sections<\/td>\n<\/tr>\n<tr>\n<td data-col-size=\"lg\">Cooling Section<\/td>\n<td data-col-size=\"md\">84 m \/ 14 sections<\/td>\n<\/tr>\n<tr>\n<td data-col-size=\"lg\">Extruder Arrangement<\/td>\n<td data-col-size=\"md\">\u03a680 (screen) + \u03a6175 (XLPE) + \u03a6100 (screen)<\/td>\n<\/tr>\n<tr>\n<td data-col-size=\"lg\">Installed Power<\/td>\n<td data-col-size=\"md\">1000 kVA<\/td>\n<\/tr>\n<tr>\n<td data-col-size=\"lg\">Utilities<\/td>\n<td data-col-size=\"md\">Water, compressed air, high-purity nitrogen (99.5%)<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p dir=\"auto\">Higher-output configurations (up to 500 kV, 3250 mm\u00b2 conductors, 145 mm diameter, 45 m\/min) available upon request.<\/p>\n<p dir=\"auto\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-30010\" src=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/b4fd06f9a643555653376b857f3dd5a.png\" alt=\"110kV XLPE High-Voltage Cable Triple Extrusion CCV Production Line\" width=\"1442\" height=\"272\" srcset=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/b4fd06f9a643555653376b857f3dd5a.png 1842w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/b4fd06f9a643555653376b857f3dd5a-400x76.png 400w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/b4fd06f9a643555653376b857f3dd5a-1300x246.png 1300w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/b4fd06f9a643555653376b857f3dd5a-768x145.png 768w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/b4fd06f9a643555653376b857f3dd5a-1536x290.png 1536w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/b4fd06f9a643555653376b857f3dd5a-18x3.png 18w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/b4fd06f9a643555653376b857f3dd5a-430x81.png 430w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/b4fd06f9a643555653376b857f3dd5a-700x132.png 700w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/b4fd06f9a643555653376b857f3dd5a-150x28.png 150w\" sizes=\"(max-width: 1442px) 100vw, 1442px\" \/><\/p>\n<h3 dir=\"auto\">Key Line Components &amp; Engineering Highlights<\/h3>\n<ul dir=\"auto\">\n<li><strong>Extruder Group &amp; Precision Triple Crosshead<\/strong> \u2014 Three dedicated extruders connected to a single three-layer crosshead for uniform melt flow, easy centering, and rapid changeover.<\/li>\n<li><strong>Pay-off Stand, Accumulator &amp; Tension Control<\/strong> \u2014 Precision conductor handling with minimal damage and stable tension.<\/li>\n<li><strong>Dual-Rotation Haul-off Caterpillars &amp; Capstans<\/strong> \u2014 Independently frequency-controlled motors for haul-off and rotation, ensuring gentle handling of heavy conductors.<\/li>\n<li><strong>Cooling &amp; Take-up Systems<\/strong> \u2014 Multi-section cooling tubes and robust take-up stands for continuous, high-quality production.<\/li>\n<li><strong>Complete Utilities Package<\/strong> \u2014 Nitrogen storage (\u22656 m\u00b3 \u00d7 2), circulating water cooling, and compressed air systems engineered for safety, efficiency, and low consumption.<\/li>\n<\/ul>\n<div id=\"attachment_30011\" style=\"width: 810px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-30011\" class=\"wp-image-30011 size-full\" src=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/36cd2a45289e8d2d1e5c79993a43107.png\" alt=\"Pay-off Stand MV\/HV CCV Line for High Voltage Cables\" width=\"800\" height=\"500\" srcset=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/36cd2a45289e8d2d1e5c79993a43107.png 800w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/36cd2a45289e8d2d1e5c79993a43107-400x250.png 400w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/36cd2a45289e8d2d1e5c79993a43107-768x480.png 768w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/36cd2a45289e8d2d1e5c79993a43107-18x12.png 18w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/36cd2a45289e8d2d1e5c79993a43107-430x269.png 430w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/36cd2a45289e8d2d1e5c79993a43107-700x438.png 700w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/36cd2a45289e8d2d1e5c79993a43107-150x94.png 150w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-30011\" class=\"wp-caption-text\">Pay-off Stand MV\/HV CCV Line for High Voltage Cables<\/p><\/div>\n<p>&nbsp;<\/p>\n<div id=\"attachment_30012\" style=\"width: 810px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-30012\" class=\"wp-image-30012 size-full\" src=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/a364d97d77aa125825c679de9582047.png\" alt=\"Accumulator MV\/HV CCV Line for High Voltage Cables\" width=\"800\" height=\"500\" srcset=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/a364d97d77aa125825c679de9582047.png 800w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/a364d97d77aa125825c679de9582047-400x250.png 400w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/a364d97d77aa125825c679de9582047-768x480.png 768w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/a364d97d77aa125825c679de9582047-18x12.png 18w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/a364d97d77aa125825c679de9582047-430x269.png 430w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/a364d97d77aa125825c679de9582047-700x438.png 700w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/a364d97d77aa125825c679de9582047-150x94.png 150w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-30012\" class=\"wp-caption-text\">Accumulator MV\/HV CCV Line for High Voltage Cables<\/p><\/div>\n<p>&nbsp;<\/p>\n<div id=\"attachment_30013\" style=\"width: 810px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-30013\" class=\"wp-image-30013 size-full\" src=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/c4e141eb8cdc2193ceeb63680477306.png\" alt=\"Lower Pull-Out Capstan MV\/HV CCV Line for High Voltage Cables\" width=\"800\" height=\"500\" srcset=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/c4e141eb8cdc2193ceeb63680477306.png 800w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/c4e141eb8cdc2193ceeb63680477306-400x250.png 400w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/c4e141eb8cdc2193ceeb63680477306-768x480.png 768w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/c4e141eb8cdc2193ceeb63680477306-18x12.png 18w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/c4e141eb8cdc2193ceeb63680477306-430x269.png 430w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/c4e141eb8cdc2193ceeb63680477306-700x438.png 700w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/c4e141eb8cdc2193ceeb63680477306-150x94.png 150w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-30013\" class=\"wp-caption-text\">Lower Pull-Out Capstan MV\/HV CCV Line for High Voltage Cables<\/p><\/div>\n<p>&nbsp;<\/p>\n<div id=\"attachment_30014\" style=\"width: 810px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-30014\" class=\"wp-image-30014 size-full\" src=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/ebbe6bcfae9fa3bf74f2b3c37507ef1.png\" alt=\"Accumulator &amp; Upper Auxiliary Caterpillar MV\/HV CCV Line for High Voltage Cables\" width=\"800\" height=\"500\" srcset=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/ebbe6bcfae9fa3bf74f2b3c37507ef1.png 800w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/ebbe6bcfae9fa3bf74f2b3c37507ef1-400x250.png 400w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/ebbe6bcfae9fa3bf74f2b3c37507ef1-768x480.png 768w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/ebbe6bcfae9fa3bf74f2b3c37507ef1-18x12.png 18w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/ebbe6bcfae9fa3bf74f2b3c37507ef1-430x269.png 430w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/ebbe6bcfae9fa3bf74f2b3c37507ef1-700x438.png 700w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/ebbe6bcfae9fa3bf74f2b3c37507ef1-150x94.png 150w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-30014\" class=\"wp-caption-text\">Accumulator &amp; Upper Auxiliary Caterpillar MV\/HV CCV Line for High Voltage Cables<\/p><\/div>\n<p>&nbsp;<\/p>\n<div id=\"attachment_30015\" style=\"width: 810px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-30015\" class=\"wp-image-30015 size-full\" src=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/de5e8ce43542526da4aadebf9aa49be.png\" alt=\"Accumulator &amp; Upper Auxiliary Caterpillar MV\/HV CCV Line for High Voltage Cables 1\" width=\"800\" height=\"500\" srcset=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/de5e8ce43542526da4aadebf9aa49be.png 800w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/de5e8ce43542526da4aadebf9aa49be-400x250.png 400w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/de5e8ce43542526da4aadebf9aa49be-768x480.png 768w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/de5e8ce43542526da4aadebf9aa49be-18x12.png 18w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/de5e8ce43542526da4aadebf9aa49be-430x269.png 430w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/de5e8ce43542526da4aadebf9aa49be-700x438.png 700w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/de5e8ce43542526da4aadebf9aa49be-150x94.png 150w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-30015\" class=\"wp-caption-text\">Accumulator &amp; Upper Auxiliary Caterpillar MV\/HV CCV Line for High Voltage Cables<\/p><\/div>\n<p>&nbsp;<\/p>\n<div id=\"attachment_30016\" style=\"width: 810px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-30016\" class=\"wp-image-30016 size-full\" src=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/c12e040fedab38d8eca7debbf0eea91.png\" alt=\"Lower Pull-Out Caterpillar MV\/HV CCV Line for High Voltage Cables\" width=\"800\" height=\"500\" srcset=\"https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/c12e040fedab38d8eca7debbf0eea91.png 800w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/c12e040fedab38d8eca7debbf0eea91-400x250.png 400w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/c12e040fedab38d8eca7debbf0eea91-768x480.png 768w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/c12e040fedab38d8eca7debbf0eea91-18x12.png 18w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/c12e040fedab38d8eca7debbf0eea91-430x269.png 430w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/c12e040fedab38d8eca7debbf0eea91-700x438.png 700w, https:\/\/doingcable.com\/wp-content\/uploads\/2026\/05\/c12e040fedab38d8eca7debbf0eea91-150x94.png 150w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><p id=\"caption-attachment-30016\" class=\"wp-caption-text\">Lower Pull-Out Caterpillar MV\/HV CCV Line for High Voltage Cables<\/p><\/div>\n<h3 dir=\"auto\">Proven Value for Cable Manufacturers<\/h3>\n<p dir=\"auto\">Operators worldwide report <strong>higher productivity<\/strong>, <strong>lower scrap rates<\/strong>, <strong>superior cable roundness<\/strong> (critical for jointing and installation), <strong>reduced material consumption<\/strong>, \u060c \u0648 <strong>minimal maintenance<\/strong>. Whether producing standard MV\/HV cables or specialized designs for demanding environments, this line provides the technical foundation for long-term manufacturing leadership and competitive advantage.<\/p>\n<p dir=\"auto\"><strong>Ready to transform your high-voltage cable production?<\/strong><\/p>\n<p dir=\"auto\">Our engineering team is prepared to deliver a fully customized technical proposal, detailed line layout, ROI analysis, or factory demonstration tailored to your exact requirements.<\/p>\n<p dir=\"auto\"><strong>\u0627\u0633\u062a\u0641\u0633\u0631 \u0627\u0644\u0622\u0646<\/strong><\/p>\n<p dir=\"auto\">Contact us today for complete specifications, quotation, and technical consultation. Let us help you achieve reliable quality, customized solutions, and sustained success through long-term partnership.<\/p>","protected":false},"excerpt":{"rendered":"<p dir=\"auto\">\u064a\u064f\u0639\u062f \u062e\u0637 \u0625\u0646\u062a\u0627\u062c \u0643\u0627\u0628\u0644\u0627\u062a \u0627\u0644\u0637\u0627\u0642\u0629 \u0627\u0644\u0645\u0639\u0632\u0648\u0644\u0629 \u0628\u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0641\u0644\u0643\u0646\u0629 \u0627\u0644\u0645\u0633\u062a\u0645\u0631\u0629 (CCV) \u062b\u0644\u0627\u062b\u064a\u0629 \u0627\u0644\u0628\u062b\u0642 \u0645\u0646 \u0634\u0631\u0643\u0629 Baicheng \u0628\u062c\u0647\u062f 110 \u0643\u064a\u0644\u0648\u0641\u0648\u0644\u062a \u062d\u0644\u0627\u064b \u0647\u0646\u062f\u0633\u064a\u0627\u064b \u062f\u0642\u064a\u0642\u0627\u064b \u0644\u062a\u0635\u0646\u064a\u0639 \u0643\u0627\u0628\u0644\u0627\u062a \u0637\u0627\u0642\u0629 \u0639\u0627\u0644\u064a\u0629 \u0627\u0644\u062c\u0648\u062f\u0629 \u0645\u0639\u0632\u0648\u0644\u0629 \u0628\u0645\u0627\u062f\u0629 XLPE \u0628\u062c\u0647\u062f \u064a\u0635\u0644 \u0625\u0644\u0649 110 \u0643\u064a\u0644\u0648\u0641\u0648\u0644\u062a. \u064a\u062a\u0645\u064a\u0632 \u0647\u0630\u0627 \u0627\u0644\u062e\u0637 \u0628\u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u0628\u062b\u0642 \u0627\u0644\u062b\u0644\u0627\u062b\u064a \u0623\u062d\u0627\u062f\u064a \u0627\u0644\u062e\u0637\u0648\u0629 \u0644\u0637\u0628\u0642\u0627\u062a \u063a\u0644\u0627\u0641 \u0627\u0644\u0645\u0648\u0635\u0644 \u0648\u0627\u0644\u0639\u0632\u0644 \u0648\u063a\u0644\u0627\u0641 \u0627\u0644\u0639\u0632\u0644\u060c \u0628\u0627\u0644\u0625\u0636\u0627\u0641\u0629 \u0625\u0644\u0649 \u062a\u0642\u0646\u064a\u0629 \u0627\u0644\u062f\u0648\u0631\u0627\u0646 \u0627\u0644\u0645\u0632\u062f\u0648\u062c \u0627\u0644\u0645\u062a\u0642\u062f\u0645\u0629 \u0648\u0646\u0638\u0627\u0645 \u0627\u0644\u062a\u062d\u0643\u0645 \u0627\u0644\u0630\u0643\u064a \u0645\u0646 \u0634\u0631\u0643\u0629 Siemens\u060c \u0645\u0645\u0627 \u064a\u0636\u0645\u0646 \u062c\u0648\u062f\u0629 \u0648\u0627\u0633\u062a\u062f\u0627\u0631\u0629 \u0648\u0625\u0646\u062a\u0627\u062c\u064a\u0629 \u0644\u0627 \u0645\u062b\u064a\u0644 \u0644\u0647\u0627 \u0644\u0644\u0643\u0627\u0628\u0644.<\/p>","protected":false},"featured_media":30009,"comment_status":"open","ping_status":"closed","template":"","meta":{"_joinchat":[]},"product_brand":[],"product_cat":[80,86,679],"product_tag":[694,698,683,702,699,695,697,701,700,685,703,696],"class_list":{"0":"post-29998","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-cable-machinery","7":"product_cat-insulation-and-sheath-extrusion-production-line","8":"product_cat-mv-ccv-lines","9":"product_tag-110kv-ccv-line","10":"product_tag-110kv-xlpe-ccv-line","11":"product_tag-catenary-continuous-vulcanization-line","12":"product_tag-custom-ccv-extrusion-line","13":"product_tag-dual-rotation-haul-off-ccv","14":"product_tag-high-voltage-cable-extrusion-line","15":"product_tag-hv-triple-crosshead-ccv","16":"product_tag-mv-hv-cable-manufacturing-equipment","17":"product_tag-siemens-tia-portal-cable-line","18":"product_tag-triple-extrusion-ccv","19":"product_tag-triple-extrusion-high-voltage-cable-line","20":"product_tag-xlpe-high-voltage-cable-production","22":"first","23":"instock","24":"shipping-taxable","25":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/doingcable.com\/ar\/wp-json\/wp\/v2\/product\/29998","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/doingcable.com\/ar\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/doingcable.com\/ar\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/doingcable.com\/ar\/wp-json\/wp\/v2\/comments?post=29998"}],"version-history":[{"count":6,"href":"https:\/\/doingcable.com\/ar\/wp-json\/wp\/v2\/product\/29998\/revisions"}],"predecessor-version":[{"id":30043,"href":"https:\/\/doingcable.com\/ar\/wp-json\/wp\/v2\/product\/29998\/revisions\/30043"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/doingcable.com\/ar\/wp-json\/wp\/v2\/media\/30009"}],"wp:attachment":[{"href":"https:\/\/doingcable.com\/ar\/wp-json\/wp\/v2\/media?parent=29998"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/doingcable.com\/ar\/wp-json\/wp\/v2\/product_brand?post=29998"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/doingcable.com\/ar\/wp-json\/wp\/v2\/product_cat?post=29998"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/doingcable.com\/ar\/wp-json\/wp\/v2\/product_tag?post=29998"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}